Utah State Route 154
Bangerter Highway | ||||
Route information | ||||
Maintained by UDOT | ||||
Length | 24.319 mi[1] (39.138 km) | |||
Existed | 1989–present | |||
Major junctions | ||||
South end | I-15 and Bangerter Parkway in Draper | |||
SR-68 in Bluffdale/Riverton SR-71 in Riverton SR-175 in South Jordan SR-48 in West Jordan SR-173 in Taylorsville SR-171 in West Valley City SR-201 in West Valley City I-80 in Salt Lake City | ||||
North end | Salt Lake City International Airport | |||
Location | ||||
Country | United States | |||
State | Utah | |||
Highway system | ||||
| ||||
|
State Route 154 (SR-154) or Bangerter Highway (named after former Utah Governor Norman H. Bangerter) is a partial expressway running west and then north from Draper through western Salt Lake County, eventually reaching the Salt Lake City International Airport in Salt Lake City. Construction began in 1988 after planning for the highway began more than two decades prior. For the next ten years, portions of the highway opened as constructed, with the entire route finished by 1998.
Original plans for the six-lane expressway running through the western suburbs of Salt Lake City placed Bangerter Highway running further north past the Salt Lake City International Airport into Davis County. However, any route north of the airport never reached fruition, whereas the original southerly end of the route was extended from Redwood Road to I-15.
Route description
[edit]This section's factual accuracy may be compromised due to out-of-date information. The reason given is: Several at-grade intersections have been converted to single-point interchanges, and single-point urban interchanges now make up about half of SR-154. (October 2024) |
State Route 154 (Bangerter Highway) begins just southeast of a single-point urban interchange at I-15 at the intersection of 13800 South in the Salt Lake City suburb of Draper. The three-lane road curves from the north to the west and widens to four lanes before accessing the I-15 interchange. Past the freeway exit, SR-154 expands to three lanes in each direction with a median barrier in the center. With the exception of two variations in the course of the road prior to an intersection at Redwood Road (SR-68), the highway heads relatively due west (there is a dip to the south for about a mile as the roadway crosses the Jordan River). Throughout its whole route, with four exceptions (I-15, SR-68, SR-48, SR-201, and I-80), SR-154 intersects only major cross streets at grade-level intersections. The route runs into the boundary of Bluffdale and Riverton before definitively entering Riverton boundaries when the highway makes a northerly curve.
Making a slight easterly jog in the process, the road maintains its six-lane divided-highway setup as it intersects 13400 South, 12600 South (SR-71) and 11400 South (SR-175 and the access road to Daybreak and the Oquirrh Mountain LDS Temple). Arriving in South Jordan, more cross streets intersect Bangerter Highway (South Jordan Parkway SR-151 and 9800 South) before the route traverses into West Jordan. There is no at-grade intersection at 9000 South and 7800 South SR-48, but an overpass with on- and off- ramps, permitting easy access to South Valley Regional Airport and allowing uninterrupted traffic flow on Bangerter. SR-154 continues, intersecting 7000 South (access to Jordan Landing) and Bennion Boulevard (6200 South). The route slides to the west, entering Taylorsville and crossing 5400 South via overpass with on- and off-ramps (SR-173) and 4700 South.
As SR-154 enters West Valley City, it intersects 4100 South, 3500 South (SR-171), and 3100 South. The highway curves northwest, intersecting with Parkway Boulevard (2700 South), Lake Park Boulevard (2400 South), and 2100 South before meeting SR-201 (21st South Freeway) at a diverging diamond interchange and entering Salt Lake City. Losing one lane in each direction, the route meanders northerly toward the Airport, crossing 1820 South and California Avenue (1300 South) before meeting at a cloverleaf interchange at I-80 and terminating at the access road to the Airport.[2]
History
[edit]Planning and construction
[edit]Planning for the West Valley Highway began in the 1960s[3] as a local federal-aid project. The proposed alignment began at the curve in SR-68 near 15300 South and proceeded north-northwesterly and northerly, following a path much like the present alignment to I-80. It continued north along what was then the west boundary of the then Salt Lake City Municipal Airport No. 1 (now Salt Lake City International Airport) into 4000 West, curving east onto 2200 North and ending at I-215. A drainage canal was moved to make room for a loop from 2200 North onto northbound I-215,[4] but when the Interstate was finished south of 2200 North (where it had ended for many years) in the mid-1980s,[5] a diamond interchange was built instead.[6] Later the north segment was rerouted to continue north-northeasterly from the airport into Davis County;[7] parts of this are now the Legacy Parkway. Salt Lake County was able to build the highway between SR-201 (2100 South) and I-80 with federal funding, but it took the state to finish it.[3]
In 1989, the Utah Transportation Commission added a portion of the proposed West Valley Highway to the state highway system as State Route 154. A newly proposed corridor ran west from I-15 near 13400 South to near 3200 West, where it joined the older proposal and headed north to I-80.[8] With the help of Governor Norman H. Bangerter, longtime resident of West Valley City, the project received needed money from the state's general fund, and was opened between SR-201 (2100 South) and SR-171 (3500 South) on November 26, 1991.[3] The Transportation Commission renamed the highway after Bangerter in May 1993.[8] It was finally completed to I-15 on November 17, 1998.[9]
Improvements
[edit]Continuous-flow intersections
[edit]In 2007, a continuous flow intersection was constructed at the junction of SR-154 and SR-171 (3500 South), one of a very few such intersections in the United States. The intersection is one of the busiest in the state and handles 100,000 vehicles on a typical weekday.[10][11] In 2011, five more intersections were upgraded to continuous-flow intersections (3100 South, 4100 South, 5400 South/SR-173, 6200 South, and 7000 South) as part of the Bangerter 2.0 project.[12] Another CFI was completed at the 13400 South intersection in 2013.[13]
Interchanges
[edit]UDOT has begun the process of converting several at-grade intersections into grade-separated interchanges, all of them single-point urban interchanges. The first was completed at 7800 South (SR-48) in 2012,[14] followed by one at Redwood Road (SR-68) in 2015.[15]
In 2016, a new interchange was completed at 600 West, the first to not replace a pre-existing intersection. At the same time, the nearby intersection at 200 West was converted to right-in/right-out access only.[16]
Through 2017 and 2018, the Bangerter Four project converted four intersections into interchanges: 5400 South (SR-173), 7000 South, 9000 South (SR-209), and 11400 South (SR-175). The 7000 South interchange was opened in 2017,[17] while the other three were completed in late 2018.[18]
In spring 2020, construction began on a grade-separated interchange at 6200 South,[19] followed by construction of similar interchanges at 12600 South (SR-71) in January 2021[20] and 10400 South (SR-151) in May 2021.[21] These three interchanges opened on May 19, 2022.[22][23]
Future
[edit]Eventually, all at-grade intersections on Bangerter Highway between I-15 and SR-201 are planned to be upgraded to grade-separated interchanges.[24] Environmental impact statements (EIS) have been completed for Bangerter intersections at 4700 South, 9800 South, and 13400 South. Construction is anticipated to start at these three locations in spring 2023.[25] The interchanges at 4700 South[26] and 13400 South[27] will be constructed as single point urban interchanges while the interchange at 9800 South will be constructed as a tight diamond interchange to minimize impacts to the surrounding community.[28]
Major intersections
[edit]The entire route is in Salt Lake County.
Location | mi[29] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|
Draper | 0.000 | 0.000 | 13800 South, Bangerter Parkway | ||
0.209 | 0.336 | 150 East | |||
0.467 | 0.752 | I-15 – Provo, Salt Lake | Single-point urban interchange; I-15 exit 289 | ||
0.798 | 1.284 | 200 West | Right-in/right-out access only | ||
1.447 | 2.329 | 1 | 600 West | Single-point urban interchange | |
Riverton–Bluffdale line | 2.355 | 3.790 | Jordan Basin Lane (1000 West) | Right-in/right-out access only, westbound only | |
3.242 | 5.217 | 3 | SR-68 (Redwood Road 1700 West) | Single-point urban interchange | |
4.244 | 6.830 | 4 | 2700 West | Currently being converted to a single-point urban interchange, expected to be complete in November 2025 | |
Riverton | 5.751 | 9.255 | 6 | 13400 South | Continuous-flow intersection; Currently being converted to a single-point urban interchange |
6.759 | 10.878 | 7 | SR-71 (12600 South) | Western terminus of SR-71; Single-point urban interchange | |
South Jordan | 8.274 | 13.316 | 8 | SR-175 (11400 South) | Western terminus of SR-175; Single-point urban interchange |
9.600 | 15.450 | 9 | SR-151 (10400 South) | Western terminus of SR-151; Single-point urban interchange | |
10.384 | 16.711 | 10 | 9800 South (Shields Lane) | Continuous-flow intersection; Currently being converted to a single-point urban interchange | |
West Jordan | 11.390 | 18.330 | 11 | SR-209 (9000 South) | Single-point urban interchange |
12.884 | 20.735 | 13 | SR-48 (7800 South) | Single-point urban interchange | |
13.885 | 22.346 | 14 | 7000 South | Single-point urban interchange | |
Taylorsville | 14.893 | 23.968 | 15 | 6200 South | Single-point urban interchange |
15.930 | 25.637 | 16 | SR-173 (5400 South) | Single-point urban interchange | |
Taylorsville–West Valley City line | 16.939 | 27.261 | 17 | 4700 South | Continuous-flow intersection; Currently being converted to a single-point urban interchange |
West Valley City | 17.936 | 28.865 | 4100 South | Continuous-flow intersection; proposed single-point urban interchange funded for construction in Spring 2028 | |
18.946 | 30.491 | SR-171 (3500 South) | Continuous-flow intersection; proposed single-point urban interchange funded for construction in Spring 2028 | ||
19.455 | 31.310 | 3100 South | Continuous-flow intersection; proposed underpass funded for construction in Spring 2028 | ||
19.991 | 32.172 | Parkway Boulevard (2700 South) | Proposed tight diamond interchange funded for construction in Spring 2028 | ||
20.513 | 33.012 | 2400 South | Proposed overpass funded for construction in Spring 2028 | ||
20.839 | 33.537 | 2100 South | Proposed interchange funded for construction in 2029; to be right-in/right-out | ||
West Valley City–Salt Lake City line | 21.013 | 33.817 | SR-201 – Magna, Salt Lake City | SR-201 exit 13; Diverging diamond interchange; to be rebuilt into a single-point urban interchange in 2029 | |
Salt Lake City | 21.388 | 34.421 | 1820 South | Proposed interchange funded for construction in 2029 | |
22.267 | 35.835 | California Avenue (1385 South) | Proposed single-point urban interchange funded for construction in Spring 2028 | ||
23.708 | 38.154 | I-80 / North Temple Street – Salt Lake City Center, Ogden, Provo, Reno | Cloverleaf interchange with directional ramp; former SR-186; I-80 exit 115A | ||
24.319 | 39.138 | Salt Lake City International Airport | Continuation beyond I-80 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
See also
[edit]
References
[edit]- ^ "State Route 154 Highway reference". Utah Department of Transportation.
- ^ "SR-154" (Map). Google Maps. Retrieved December 12, 2018.
- ^ a b c Costanzo, Joe (November 27, 1997). "W.V. Highway Now a Reality After Traveling a Rocky Road". Deseret News. Retrieved January 7, 2019.
- ^ Utah Department of Transportation, Highway Resolutions: "Route 215". (9.62 MB), updated November 2007, accessed May 2008, pp. 9, 11, 14
- ^ Federal Highway Administration, National Bridge Inventory database, 2006
- ^ "Google Maps 2100 North interchange" (Map). Google Maps. Retrieved June 8, 2009.
- ^ Utah Department of Transportation, Highway Resolutions: "Route 172". (838 KB), updated November 2007, accessed May 2008, p. 5
- ^ a b Utah Department of Transportation, Highway Resolutions: "Route 154". (2.18 MB), updated November 2007, accessed May 2008, p. 14
- ^ John Keahey, Salt Lake Tribune, Bangerter's Last Section Opens Today; Multilane highway extends from S.L. airport to Draper, November 17, 1998, p. B1
- ^ Johnson, Whit (March 7, 2007). "Continuous Flow Intersection to be Built on Bangerter Hwy". KSL-TV. Retrieved April 13, 2008.
- ^ Johnson, Whit (September 16, 2007). "Continuous Flow Intersection on Bangerter Hwy Open". KSL-TV. Retrieved December 18, 2018.
- ^ Boal, Jed (May 24, 2011). "Bangerter 2.0: upgrade ahead". KSL-TV. Retrieved December 18, 2018.
- ^ "2013 Construction Season Nears the End". UDOT Transportation Blog. Utah Department of Transportation. November 1, 2013. Retrieved December 18, 2018.
- ^ Green-Miner, Brittany; Chapman, Kelly (June 17, 2012). "New intersection opens at Bangerter Hwy and 7800 S". Fox 13. Retrieved December 18, 2018.
- ^ Lee, Jasen (July 16, 2015). "$42M interchange project complete at Bangerter Highway and Redwood Road". KSL-TV. Retrieved December 18, 2018.
- ^ Davidson, Lee (May 12, 2017). "Freeway-like interchange opening on Bangerter at 600 West". The Salt Lake Tribune. Retrieved December 18, 2018.
- ^ Harrie, Dan (November 17, 2017). "West-side commuters about to get some relief after months of construction, lane restrictions". The Salt Lake Tribune. Retrieved December 18, 2018.
- ^ Boal, Jed (November 19, 2018). "UDOT: Work complete on 4 rebuilt Bangerter Highway interchanges". KSL-TV. Retrieved December 18, 2018.
- ^ "6200 South Crews Close 6200 South at Bangerter Highway". August 24, 2021. Retrieved September 24, 2021.
- ^ "12600 SOUTH TO CLOSE AT BANGERTER HIGHWAY FOR SEVEN MONTHS". Retrieved September 24, 2021.
- ^ "10400 SOUTH IN SOUTH JORDAN CLOSED FOR SIX MONTHS". Retrieved September 24, 2021.
- ^ Turner, Jared; McPeek, Kristen (May 19, 2022). "Three new freeway-style interchanges officially open on Bangerter Highway". KUTV. Sinclair Broadcast Group. Retrieved July 28, 2022.
- ^ McKane, Scott (May 19, 2022). "Traffic flows as new interchanges open on Bangerter Highway". KSTU. E. W. Scripps Company. Retrieved July 28, 2022.
- ^ "Bangerterprojects". Utah Department of Transportation. Retrieved December 18, 2018.
- ^ "Phasing/Funding Prioritization for Bangerter Highway".
- ^ "Bangerter 4700 South" (PDF).
- ^ "Bangerter 13400 South" (PDF).
- ^ "Bangerter 9800 South" (PDF).
- ^ Utah Department of Transportation, Highway Reference Information: "SR-154". (20.7 KB), updated May 2008, accessed July 2008
External links
[edit]- Media related to Utah State Route 154 at Wikimedia Commons
- Bangerter Highway project page